Capacity / condition / future plans
200-amp panel upgrades in Sacramento
Adding an EV charger, electric appliance, or new circuits may change what your electrical system needs. A panel upgrade begins with a load assessment and a clear distinction between replacing equipment and increasing service capacity.

What to consider
Plan around the whole electrical service.
A 100-to-200-amp project can involve more than the panel cabinet. The proposal should explain the work specific to your property.
Existing panel condition
Review the panel, breakers, circuit spaces, and signs of damage or obsolete equipment.
Capacity and loads
Evaluate current and planned electrical demand. An EV charger or electric appliance may call for a new circuit, load management, or service changes.
Service equipment
Increasing amperage can require meter, conductors, grounding, or other equipment changes in addition to a panel replacement.
Coordination
Panel work may require permits, inspection, a planned outage, and utility involvement. The exact sequence depends on the address and scope.
Make an informed decision
Replacement versus capacity upgrade
A damaged or outdated panel may need replacement even if the service amperage stays the same. More circuit spaces or managed loads may be enough for some projects. Ask for a proposal that names the actual change.
From first call to clear scope
Know the next step.
Share your plans
Tell AAA about existing issues and the equipment or circuits you want to add.
Assess the system
Review panel condition, service equipment, and anticipated loads.
Agree on the scope
Review the proposed equipment, coordination steps, outage, and project-specific price.
Do I need 200-amp service for an EV charger?
Not necessarily. Charger settings, existing loads, available capacity, and possible load management all matter. A load assessment should guide the decision.
Is replacing a 100-amp panel the same as upgrading to 200 amps?
No. A panel replacement can keep the existing service rating. An amperage increase may require additional service equipment and utility coordination.
Will power be off during the work?
Panel work normally requires an interruption. Ask about the expected outage window and how it will be coordinated for your project.
Can I keep my current breakers?
Breaker compatibility depends on the new equipment and condition. The proposal should specify approved components for the chosen panel.
What determines the price?
Equipment, service changes, circuit work, access, permits, and utility requirements vary by property. AAA can explain the project-specific scope and price after assessment.
Related services
See the whole picture.
Sacramento & surrounding communities
Service closer to home.
Explore service information for your city. AAA confirms coverage and appointment availability for your address when you call.
AAA Electrical Services · Sacramento area
Let's talk about panel upgrade.
Share your address, the concern or project you have in mind, and your preferred timing. Confirm the visit scope and any diagnostic charge before scheduling; review the proposed work and upfront price before authorizing repairs.
